Is it wise to start before my product category is due?

Starting early can make sense, but it is not mandatory

Starting before your own product group is up for consideration is not required anywhere — but for many manufacturers and importers it is a practical choice to begin preparations in advance. The ESPR (Regulation (EU) 2024/1781) sets out the digital product passport obligation on a product-group-by-product-group basis: only when a product group is included in a delegated act that establishes specific requirements does the actual obligation arise. Until then, no passport requirement applies to that group. This does not mean that waiting is always the most convenient route. Gathering product data, requesting information from suppliers, and setting up internal processes often takes more time than the period between the announcement of an obligation and when it takes effect. Organisations that only start once the requirements are concrete risk coming under time pressure for work that in principle could have been spread out calmly.

For whom this is relevant, and for whom it is not

Starting early is particularly relevant for manufacturers and importers active in multiple product groups, or who are dealing with long and fragmented supply chains where data must come from different parties. For them, it is worthwhile to map out in advance which information is already available and where there are gaps, regardless of when their own product group comes up for consideration. For businesses with a single straightforward product and a clear supply chain, whose product group moreover has not yet been mentioned anywhere in the planning, the pressure to start now is less. It is also important what starting early does not deliver: the substantive requirements — which data exactly must be in the passport, in which format, with which carrier — are set per product group. Anyone who now tries to compile a passport without those requirements being known risks doing work that will have to be adjusted later.

When a product group comes up for consideration, not everything is yet determined

Which product groups will be subject to requirements and when follows from the work plan that the Commission draws up on the basis of Article 18 of the ESPR. That work plan contains a prioritisation: product groups are selected and ranked on the basis of criteria such as environmental impact and sales volume. This prioritisation is not yet fixed for all product groups, and for product groups not yet mentioned in a work plan or delegated act, there is therefore no concrete date to work towards. What is established is the system: no obligation without a product-group-specific delegated act, and that act follows on from the prioritisation in the work plan. For anyone who wants to know whether their own product group will be coming up for consideration soon, consulting the current work plan is the appropriate step — providing an estimate without that source is not worthwhile, because the planning can shift for each product group.

What this means, step by step

The first step is to check whether your own product category is already mentioned in the work plan under Article 18, and if so, in which priority round. This gives an indication of the sequence, even though a fixed deadline is not yet determined by this planning. Regardless of that schedule, it is worthwhile to inventory in advance which product data are already available internally and which still need to be obtained from suppliers or other links in the chain — that kind of work is useful regardless of when the obligation comes into force, and saves time once the requirements become concrete. For smaller companies, it is worth looking at the supporting measures that the ESPR mentions for SMEs in Article 22; these can carry weight in deciding whether, and at what pace, to make an early start. Finally, it is prudent to bear in mind that data collected early may need to be adjusted once the final requirements for each product category are known — starting early saves time, but is no guarantee that the work remains unchanged and usable.

What this is based on: Article 18 and Article 22 ESPR

Article 18 of the ESPR (Regulation (EU) 2024/1781) provides that the Commission shall draw up a work plan in which product categories are prioritised and ordered on the basis of established criteria. This work plan forms the basis for the subsequent delegated acts in which the actual requirements for each product category — including the digital product passport obligation — are established. Article 22 of the same regulation describes the supporting measures available to small and medium-sized enterprises in complying with the ESPR.

Those wishing to know where their product category stands in this planning can consult the current work plan via the official source. Regardless of that planning, it is worthwhile to start mapping available product data and requesting missing information from suppliers — that work does not have to wait for a final date and is the basis with which prodpas.eu compiles a passport once that becomes relevant for a product category.

Where this is based on

The regulation itself is on EUR-Lex. We provide references for each claim; you do not have to take our word for it.

What you must do concretely

What is expected of you

The ESPR does not work with a single entry date for all products at once. Article 18 of the ESPR (Regulation (EU) 2024/1781) describes how the European Commission works with prioritization and planning: product categories are designated one after another via delegated regulations, each with its own requirements and its own timeline. This means that a company with products in multiple product categories is not "on the list" at one moment, but at different moments for different products.

Knowing when your product category is due

For a company with 10 to 100 employees, this above all means: keeping track of which product categories have already been designated or are in preparation, and which are not yet. This is not a one-time check, because the Commission's planning continues. Those who do not have this overview will be surprised when a delegated regulation for their own product category appears — while competitors who were paying attention have already built up a head start. On Does the digital product passport apply to my products? is how to determine whether a product falls under a designated or announced product category.

Assessing whether starting early yields anything

Article 18 of the ESPR (Regulation (EU) 2024/1781) mentions criteria by which product categories are prioritized, such as environmental impact and sales volume. Product categories with high impact or high volume are obvious candidates for early designation. A company active in such a product category can infer from this that the likelihood of an approaching obligation is greater than for a product category that is not mentioned. This is not a guarantee of a date, but it is an indication that weighs into the question of whether getting ahead makes sense.

Taking into account the position of smaller companies

Article 22 of the ESPR (Regulation (EU) 2024/1781) addresses the position of small and medium-sized enterprises within the system. That article is relevant to the assessment of whether starting early is wise: a smaller company generally has less capacity to collect data and set up systems than a large manufacturer, and starting early can reduce that gap. At the same time, it is not an exemption — it is a consideration in planning, not in the question of whether the obligation will ultimately apply.

Where things go wrong in practice

A furniture manufacturer waits with everything until its own product category is designated, and then discovers that suppliers cannot immediately provide the requested material data — collecting data takes time that is no longer available.

An electronics importer only follows the product category in which the largest share of turnover is located, and misses that a smaller product line falls into a different, faster-prioritized product category.

A company sets up a complete product passport for a product whose requirements are not yet established for the sake of certainty, and must reorganize everything after publication of the delegated regulation because the required data fields turn out to be different than expected.

An SME assumes that the position of smaller companies under Article 22 of the ESPR (Regulation (EU) 2024/1781) automatically leads to a postponement, and therefore plans too late, while that provision does not constitute an exemption from the obligation itself.

A company only begins with internal preparation once the text of a delegated regulation is final, and thereby loses the time that other companies were already using to get employees and processes ready.

What you can document

  • An overview per product category: which product categories have already been designated, which are announced, and which appear to be candidates for prioritization based on the criteria in Article 18 of the ESPR (Regulation (EU) 2024/1781).
  • An assessment per product category of your own sales and environmental impact, as substantiation for the question of which product category deserves the most attention.
  • A list of data that will presumably be needed (material origin, repair information, composition), even if the exact list of requirements is not yet fixed — see What can I do now while the rules are not yet final? for an approach that does not depend on the final text.
  • A schedule for testing a passport template before the obligation takes effect, so that bottlenecks in data submission become visible early on; can I make a test version of the product passport in advance describes what that might look like.
  • A step-by-step plan for your own organization, including who provides which data and when; How do I approach the product passport for products step by step? provides a basic structure for that.
  • An overview of what starting early costs in terms of time and resources, weighed against the head start it provides — useful for an internal assessment, even if the obligation is not yet confirmed.

This is not legal advice. This page provides general information about the regulations that this platform concerns. We do not know your situation. If you are in doubt about your own case, consult a lawyer or the competent supervisory authority.

Written with AI on the basis of the sources above, checked by a human on 2026-08-22. Is something incorrect? Let us know — corrections are given priority.